[1]钱巨林,葛新峰,祝双桔,等.不同螺栓预紧力的水轮机顶盖及螺栓的静应力分析[J].机械与电子,2021,(02):12-16.
 QIAN Julin,GE Xinfeng,ZHU Shuangju,et al.Static Stress Analysis of Top Cover and Connecting Bolts on Kaplan Turbine under Different Bolts Preload[J].Machinery & Electronics,2021,(02):12-16.
点击复制

不同螺栓预紧力的水轮机顶盖及螺栓的静应力分析()
分享到:

机械与电子[ISSN:1001-2257/CN:52-1052/TH]

卷:
期数:
2021年02期
页码:
12-16
栏目:
设计与研究
出版日期:
2021-02-26

文章信息/Info

Title:
Static Stress Analysis of Top Cover and Connecting Bolts on Kaplan Turbine under Different Bolts Preload
文章编号:
1001-2257(2021)02-0012-05
作者:
钱巨林1葛新峰2祝双桔3张 斌1蔡建国 3化洪昌2曹中成2李 德2徐 旭2
1.国网新源水电有限公司富春江水力发电厂,浙江 桐庐311504;
2.河海大学能源与电气学院,江苏 南京 210098 ;
3.重庆航运建设发展(集团)有限公司,重庆 401121
Author(s):
QIAN Julin 1GE Xinfeng 2ZHU Shuangju3ZHANG Bin1CAI Jianguo3HUA Hongchang2CAO Zhongcheng2 LI De2XU Xu 2
 1.Fuchunjiang Hydropower Plant, State Grid Xinyuan Hydropower Co., Ltd.,Tonglu 311504,China;
2.College of Energy and Electrical EngineeringHohai University, Nanjing 210098,China;
3.Chongqing Shipping Construction Development Co., Ltd., Chongqing 401121, China
关键词:
轴流式水轮机顶盖顶盖螺栓预紧力应力
Keywords:
Kaplan turbinetop covertop cover boltsbolts preloadstress
分类号:
TK733.3
文献标志码:
A
摘要:
使用ANSYS有限元软件建立了某电站轴流式水轮机顶盖及螺栓的模型,研究了不同预紧力工况下顶盖及螺栓的变形和应力分布。结果表明:顶盖应力梯度较大处主要存在于于内顶盖上盖板、内外顶盖法兰螺栓把合处以及开孔两端,螺栓同时承受轴向荷载和弯矩的作用,螺栓横截面应力存在不均匀性;顶盖局部应力与预紧力敏感性比较弱,螺栓应力变化敏感,螺栓预紧力的敏感性依次为变化相对短筋板、上盖板、长筋板。
Abstract:
 ANSYS was used to establish the model of head bolts of a Kaplan turbine and combined with the boundary conditions and constraints of the top cover and connecting bolts, the stress distribution under different preloading conditions was studied. The conclusion proves that the larger stress gradient mainly concentrates on the places of upper cover plate, joint of the flange bolts, long radial stiffeners and short radial stiffeners in emergency shutdown condition. Stress of the upper cover plate, long radial stiffeners and short radial stiffeners does not change obviously with the increase of bolts preload, but the bolts stress is almost proportional to bolts preload. In the three structures, short radial stiffeners are more sensitive to the change of bolts preload, followed by upper cover plate and long radial stiffeners.

参考文献/References:

[1]丁景焕,赵强,曹佳丽,等.抽水蓄能机组顶盖漏水原因分析[J].人民长江,2017,48(23):100-104.

[2]何少润,陈泓宇,杨昭,等.浅谈对大型抽水蓄能机组顶盖螺栓预紧力的认识[J].水电与抽水蓄能,2018,4(1):11-14,31.

[3]张续钟,刘思靓,马建峰.混流式水轮发电机顶盖螺栓的安全性设计方法[J].小水电,2017(5):25-28.

[4]熊欣,李浩亮.蓄能机组顶盖座环联接螺栓强度分析[J]. 中国设备工程,2018(5):137-139.

[5]王雅.传统与欧盟法兰连接螺栓预紧力计算方法对比研究[D].兰州: 兰州理工大学,2017.

[6]李济含.基于ABAQUS的铝合金轮毂螺栓预紧力仿真研究[D].秦皇岛: 燕山大学,2016.

[7]何柏灵,吕桂萍,肖良瑜.考虑螺栓预紧力的顶盖变形分析[C]//中国动力工程学会水轮机专业委员会,中国水力发电工程学会水力机械专业委员会,中国电机工程学会水电设备专业委员会.第十九次中国水电设备学术研讨会论文集.哈尔滨:黑龙江科学技术出版社,2013:234-237.

[8]时汉武.迪什林电站水轮机顶盖、支持盖有限元分析及结构改进设计[J].东方电机,1994(2):7-13,19.

[9]吴文界,雷徐.抽水蓄能电厂水泵水轮机顶盖简介[J].水电站机电技术,2012,35(4):57-58.

[10]周振德,宋天霞.大型水轮机顶盖、支持盖的优化设计[J].华中工学院学报,1987(3):47-54.

备注/Memo

备注/Memo:

收稿日期:2020-07-30
基金项目:国网新源科技项目(525688170003);国家自然科学基金面上项目(51579080);中央高校基本科研业务费(2015B02814)

作者简介:钱巨林(1967-),男,浙江杭州人,高级工程师,主要从事水电站生产、技术管理工作;葛新峰(1981-),男,江苏盐都人,讲师,主要从事水力机械结构及多相流研究,通信作者;祝双桔(1982-),男,重庆人,工程师,主要从事水电站生产管理工作;张斌(1985-),男,浙江杭州人,工程师,主要从事水电站运行维护管理工作。

更新日期/Last Update: 2021-02-26